Piet Brouwer Electrotechnology delivers electrical system for new build twin rigger UK-24

November 25, 2020: Piet Brouwer Electrotechnology successfully delivered the entire electrical system on the new twin rigger UK-24 “Anna” including the alarm system, fire detection and lighting package, as well as comprehensive system integration.

Piet Brouwer Electrotechnology was commissioned by Albert Romkes and the main contractor Hoekman Shipbuilding and has a long-standing relationship with the Romkes family, for whom it has worked on a range of new projects and refits over the years, including the UK-2, UK-22 and the former UK-24 “Zuiderkruis”.