New electrical boiler of 10MW for Habesha in Ethiopia

To reduce their CO2 emissions, Habesha decided to replace an oil-fired boiler with a 10MW electric boiler. The grid connection had to be upgraded, and a new power supply had to be installed to power both the brewery and the new boiler.

We delivered:

  • New mains distribution panel 33kV
  • Step down transformer 33kV->11kV, 10MVA
  • Integration between the high voltage installation and the boiler controls.
  • All installation materials needed
  • Packing and transport
  • Turn key installation